1. Purpose
This packet provides builders, modular manufacturers, HVAC contractors, and inspectors with the complete requirements needed to achieve EPA Indoor AirPLUS v2 certification, including CFIS ventilation specifications.
2. Moisture Management Requirements
- Drainage plane: ASTM E2556 Type I or II, fully taped with shingle-style integration.
- Flashing: AAMA 711/714 compliant; pan flashing under all windows and exterior doors.
- Kickout flashing at roof-to-wall intersections.
- Gutters/downspouts: discharge ≥5 ft from foundation or to approved drain.
- Foundation waterproofing required.
- Capillary break under bottom plates; 10 mil poly under slab.
- Crawlspaces (if built): sealed, conditioned, insulated at walls.
3. Pest Barriers
- Seal all penetrations ≥ 1/4 inch with pest-resistant sealant.
- Termite protection per SC building code.
- Maintain minimum 6-inch soil clearance at siding.
- Avoid placing mulch within 12 inches of building.
4. HVAC Design Requirements (Manual J/S/D)
- Manual J: Room-by-room load calculation.
- Manual S: Equipment selection within ±15% of Manual J loads.
- Manual D: Duct design sized for ≤0.36 in. w.c. external static pressure.
- AHRI certificate for installed heat pump model.
5. HVAC Installation Requirements
- ECM blower motor required.
- Duct leakage target: ≤4 CFM25 per 100 sq ft.
- Refrigerant charge verified via manufacturer-approved method.
- Line set insulation thickness ≥3/8".
- Condensate pan + float switch required.
6. CFIS System Specifications (Mechanical Ventilation)
- Ventilation airflow meets ASHRAE 62.2:
Formula: 0.03 × floor area + 7.5 × (bedrooms + 1)
- Motorized damper required (normally closed, fail-safe).
- Outdoor air duct connects to return duct downstream of filter.
- Intake placement:
- ≥10 ft from exhausts
- ≥2 ft above grade
- ≥3 ft from operable windows/doors
- Screened (≤1/4" mesh)
- Duct should be rigid or semi-rigid; minimize long flex runs.
- MERV 13 preferred; MERV 11 minimum.
- Filter must be upstream of coil; rack must be sealed against bypass.
- Pressure drop ≤0.25 in. w.c. or ECM auto-compensation documented.
- Outdoor airflow verification using flow hood required.
- Controller must allow continuous or intermittent scheduling.
- Noise criteria: Bath fans ≤1.0 sone if used in CFIS operation.
7. Radon-Ready Construction
- Gravel layer under slab.
- 10 mil poly vapor barrier.
- T-fitting + vertical 3" PVC vent run to roof.
- System labeled “Radon System.”
8. Materials Requirements (Low-VOC)
- Paints: <50 g/L (flat), <150 g/L (non-flat).
- Adhesives and sealants: SCAQMD Rule 1168 compliant.
- Composite wood: CARB Phase 2 or TSCA Title VI compliant.
- Carpet + pad: CRI Green Label Plus certified.
9. Air Sealing Requirements
- Blower door target: ≤3.0 ACH50 (preferred ≤2.5 for ZERH alignment).
- Seal top plates, rim joists, attic access, drywall/subfloor seams.
10. Commissioning Requirements
- Whole-house mechanical ventilation test.
- Room pressure balancing: ≤3 Pa difference.
- HVAC external static pressure measurement.
- Radon test recommended post-occupancy.
- Document all CFIS airflow, damper verification, and controller settings.
11. Required Documentation for Indoor AirPLUS v2
- Manual J/S/D package.
- AHRI certificate.
- Ventilation airflow test form.
- CFIS damper verification sheet.
- Filter specification sheets.
- VOC certifications for paints, adhesives, flooring, cabinetry.
- Moisture management photo log.
- Radon system rough-in photos.
- Blower door and duct leakage reports.
------------------------------------------------------------
Builder Summary
1. Moisture & Site
- WRB taped, lapped shingle-style.
- Pan flashing at all windows/doors; kick-out flashing.
- Downspouts discharge ≥5 ft from foundation.
- Foundation waterproofed; poly under slab.
- Maintain 6" soil clearance; no mulch within 12".
2. HVAC & CFIS
Heat Pump / Ducts:
- ECM blower motor.
- Duct leakage ≤4 CFM25/100 ft².
- Line sets insulated ≥3/8".
CFIS Fresh-Air:
- Fresh-air intake: ≥10 ft from exhausts, ≥2 ft above grade, ≥3 ft from windows/doors.
- 6" insulated duct → return duct (downstream of filter).
- Motorized damper (normally closed).
- MERV 11–13, 4" media filter upstream of coil.
- Verify airflow meets ASHRAE 62.2.
- Bath fans ≤1.0 sone if used.
3. Radon-Ready
- 3" PVC radon vent to roof; gravel + 10 mil poly under slab.
4. Interior Materials
- Low-VOC paints, adhesives, sealants.
- TSCA Title VI / CARB2 composite wood.
- CRI Green Label Plus carpet/pad.
5. Tests Required
- Blower door ≤3 ACH50.
- Duct leakage test.
- CFIS airflow test.
- CO alarms installed.
-------------------------------------------------------
Modular Manufacturer Instructions
1. Envelope & Air Sealing
- Insulation Grade I: Ceiling R-38; Walls R-20 or R-13+R-3; Floors R-19.
- Continuous air barrier per factory drawings.
- All sheathing seams taped; penetrations sealed.
2. Windows & Doors
- U-factor ≤0.30; SHGC ≤0.25.
- NFRC labels remain on units.
- Factory-integrated flashing where applicable.
3. HVAC & CFIS Interface
- Install ECM blower air handler.
- Provide sealed return plenum with 6" fresh-air duct tap.
- Provide filter rack for 4" MERV 11–13 media filter upstream of coil.
- Maintain coil + filter access.
- Pre-wire for CFIS controller.
4. Radon Coordination
- Show chase path in drawings if applicable.
5. Low-VOC Materials
- Low-VOC paints/adhesives/sealants.
- CARB2/TSCA Title VI composite woods.
- CRI Green Label Plus carpet/pad.
6. Documents to Ship
- Window/NFRC list.
- AHRI heat pump certificate.
- Filter specs.
- VOC compliance sheets.
- Factory QA checklist.
ENERGY STAR® certified homes deliver improved efficiency, comfort, and durability.
This exhibit outlines all design, construction, and verification requirements for ENERGY STAR v3.2 certification.
- HVAC Design Checklist
- HVAC Installation Checklist
- Rater Field Checklist
Insulation:
- Grade I installation
- R-38 attic min (R-49 pref)
- R-20 walls or R-13 + R-5
Windows:
- U ≤0.30 / SHGC ≤0.25
Air Sealing:
- ≤3.0 ACH50 required
Manual J: loads, window data, infiltration
Manual S: AHRI-match, sizing ±15%
Manual D: ≤0.36 in. w.c. ESP
- ECM blower
- Refrigerant charge verified
- Duct leakage ≤4 CFM25/100 ft²
- Line set insulation ≥3/8 in
Formula: 0.03 × floor area + 7.5 × (bedrooms + 1)
Systems: CFIS, ERV, HRV
- WRB shingle-style
- Pan flashing & kickouts
- Downspouts ≥5 ft
- UEF ≥0.90
- Piping R-3 insulation
- Compact plumbing encouraged
- Blower door ≤3.0 ACH50
- Duct leakage test
- Ventilation airflow
- Static pressure measurement
- Manuals J/S/D
- AHRI certificate
- NFRC list
- Photo documentation
Envelope: R-49 pref, U ≤0.30
HVAC: ECM, ≤4 CFM25
Ventilation: ASHRAE 62.2
- Grade I insulation
- NFRC labels attached
- Fresh-air duct tap installed
- Include QA + AHRI docs
- Aligned air barrier
- Knee wall backing
- Attic baffles all bays
- Sealed chases & soffits
- Cooling airflow CFM/ton
- Static pressure test
- Fan watt draw
- TXV/EEV confirm
- Smart/programmable
- Heat pump backup lockout
- Stage indicator required
- 90% ENERGY STAR lighting
- ENERGY STAR refrigerator/dishwasher
- Bath fans ≤3.0 sones
- Continuous fans ≤1.0 sone
- Range hoods vent outdoors
- Independent controls
- EV charger outlet
- 240V dryer
- Solar conduit
- HPWH circuit
- Service clearances
- Tool-free filter access
- Proper return grille sizing
- Signed HVAC Design/Install/Rater checklists
- HERS certificate
- ENERGY STAR certificate
- Photo documentation
Module Integration:
- Seal all module seams with foam + air barrier tape.
- Complete insulation at all marriage wall cavities.
- Restore continuous air barrier across ceiling, wall, floor planes.
WRB & Flashing Integration:
- Install WRB shingle-style across module seams.
- Tape all sheathing joints.
- Install pan, side, and head flashing at all windows/doors.
Attic & Roof Integration:
- Add attic baffles at all rafter bays AND module joints.
- Confirm attic ventilation continuity.
Duct & Mechanical Completion:
- Seal all field duct connections with mastic.
- Re-insulate any damaged ducts.
- Confirm filter access is tool-free.
- Install exterior fresh-air hood and connect CFIS duct.
Foundation & Rim Joist:
- Seal slab-to-wall transitions.
- Install sill seal and rim joist sealing.
Site Drainage:
- Confirm downspouts direct water ≥5 ft from foundation.
Factory Air Barrier:
- Provide documented air barrier locations and materials.
- Seal behind tubs, showers, and stair walls.
- Seal all plumbing, electrical, mechanical penetrations pre-drywall.
Factory Ductwork (If Applicable):
- Conduct optional pre-transport duct leakage test.
- Label all duct connection points for set crew.
Marriage Wall Preparation:
- Install insulation where accessible.
- Provide diagram identifying areas requiring site-installed insulation.
HVAC Integration:
- Ensure return plenum sizing meets Manual D.
- Confirm ECM blower accessibility.
- Provide coil, drain pan, and platform details.
Window & Door Integration:
- Install windows to factory spec.
- Leave NFRC labels attached.
- Provide water management notes for builder.
Documentation Shipped with Modules:
- NFRC window list
- AHRI certificate
- Factory insulation QA sheet
- Air barrier notes and diagrams
- Mechanical integration sheet
Version 2.0 (2023–2025)
EPA WaterSense® certified homes use 20–30% less water indoors, protect plumbing systems, and reduce utility bills.
This packet provides:
Product specifications (plumbing fixtures)
Hot water delivery requirements
Leak prevention requirements
Landscape/irrigation requirements (if applicable)
Builder and manufacturer responsibilities
Required documentation for certification
WaterSense® certification requires all installed fixtures to meet product-level efficiency standards.
Must be WaterSense certified
Maximum flush volume: 1.28 gallons per flush (gpf)
Dual-flush systems acceptable if both modes meet performance criteria
Maximum flow rate: 1.5 gallons per minute (gpm)
Must be WaterSense-labeled
Maximum flow rate: 2.2 gpm
Multi-function sprayers allowed
Must be WaterSense-labeled
Maximum flow: 2.0 gpm
Multi-showerhead systems must meet combined flow requirements
Must be ENERGY STAR-certified
Integrated water factor (IWF): ≤3.2
Must be ENERGY STAR-certified
Ensures faster hot water delivery and less wasted water.
A hot water fixture must deliver water at ≤0.5 gallons of waste before reaching 120°F.
System must meet at least ONE option:
Structured plumbing manifold
Demand-initiated pump
Compact plumbing design (short trunk + branches)
All hot water lines insulated to minimum R-3
Pipe diameter must match WaterSense prescriptive tables
Allowed ONLY if demand-controlled
NO timer-controlled or continuous circulation systems
Builder must install:
A whole-house leak detection device
OR
A main shutoff valve that allows electronic monitoring
All supply plumbing must pass standard pressure test
No visible leaks at fixtures during verification
Inspector performs a no-flow-meter-test to check for hidden leaks
If landscaping is provided by the builder.
Turfgrass restricted to 40% or less of total landscaped area OR
Use only WaterSense-certified plants, native species, and climate-appropriate vegetation
All installed irrigation systems must include:
WaterSense-certified irrigation controller
Pressure-regulated sprinklers
Drip irrigation for beds
No overspray to sidewalks, driveways, or foundations
Rain sensor or soil moisture sensor
Must include a permanent cover
Auto-fill systems discouraged
ENERGY STAR refrigerator
ENERGY STAR dishwasher
ENERGY STAR clothes washer
ENERGY STAR-labeled water heater optional but preferred
Builders must complete all on-site WaterSense requirements:
Install only WaterSense-labeled fixtures
Insulate all hot water lines
Provide compact plumbing layout to reduce wait times
Verify leak-free system at install
Install compliant landscape and irrigation system
Ensure irrigation controller is WaterSense-labeled
Set final irrigation schedule in “Water Budget Mode”
Provide model numbers of all WaterSense fixtures
Submit plumbing layout for verification
Supply landscape plan (if applicable)
Modular builders complete the factory-controlled portion of WaterSense.
Install WaterSense-labeled faucets and showerheads
Provide labeled toilets OR leave toilet installation to builder
Label all plumbing appliances with model numbers
Insulate hot water lines inside modules
Seal penetrations in plumbing walls
Provide plumbing schematic to the builder
Include product sheets for faucets and showerheads
Include the factory plumbing QA checklist
Provide pressure test report (optional but recommended)
The certified rater must verify:
WaterSense certification labels on fixtures
Hot water delivery performance test
Leak-free system
Pipe insulation coverage
Landscape type
Irrigation controller certification
Irrigation pressure and coverage tests
WaterSense Checklist
Product model number verification
Final signed WaterSense Verification Form
Plumbing fixture list with model numbers
Hot water plumbing layout
Landscape/irrigation plan (if applicable)
Factory fixture model numbers
Plumbing schematic
Optional QA checklist
Indoor performance test results
Outdoor efficiency verification
Final EPA WaterSense verification
Zero Energy Ready Home (ZERH)
Full Technical Specification Packet
Domus Serenitas · Greenville, South Carolina (Climate Zone 3A)
ZERH represents the highest federal performance tier. This packet defines all builder, manufacturer, HVAC, plumbing, and rater requirements for achieving certification in CZ 3A.
ZERH requires full compliance with: ENERGY STAR v3.2; Indoor airPLUS; WaterSense (if provided); Solar-ready; Electric-ready; ZERH Additional Specs; HERS Rating ≤55 (target ≤50).
Attic R‑49; Walls R‑20 or R‑13 + R‑5 CI; Floors R‑19; Slab R‑5 (2 ft vertical). Windows: U ≤ 0.30, SHGC ≤ 0.25. Blower door: ≤3.0 ACH50 (target 2.0).
Heat pump ≥15.2 SEER2 / 8.1 HSPF2. ECM blower motor. AHRI-matched. Manual J/S/D required. Duct leakage ≤4 CFM25/100 ft²; ducts inside conditioned space preferred.
Acceptable systems: ERV, HRV, CFIS. Must meet ASHRAE 62.2 airflow. Dedicated controls required. Measured airflow verification mandatory.
≤0.5 gallons wasted to 120°F. Compact/structured layout. Hot water piping insulated to R‑3. Demand-controlled recirculation allowed.
≥300 ft² obstruction-free roof (south/SW). Conduit attic→panel. Roof designed for +4 psf PV load. Reserve breaker space. PV-ready label locations required.
240V EV charger. 240V dryer outlet. HPWH-ready circuit. Smart panel/labeled breakers recommended.
100% high-efficacy lighting. ENERGY STAR appliances (if installed). Bath fans ≤1.0 sone.
Full Indoor airPLUS compliance: moisture management, pest barriers, radon-ready, low-VOC, CFIS/ERV/HRV, MERV 11–13 filter, commissioning.
WaterSense irrigation controller, drip irrigation, native plants, indoor fixtures already above code.
Install Grade I insulation, continuous air barrier, ducts in conditioned space, solar-ready & electric-ready rough-ins, ERV/HRV or CFIS, ≤3.0 ACH50, module seam sealing.
Factory-installed Grade I insulation, compliant windows, air-barrier continuity, ECM air handler, MERV 11–13 filter rack, fresh-air tap, internal R‑3 hot water piping.
Blower door, duct test, ventilation airflow, hot water delivery, solar-ready, electric-ready, Indoor airPLUS, ENERGY STAR checklist, final HERS rating.
Builder: HVAC J/S/D, plumbing layout, solar plan, electrical-ready docs. Manufacturer: QA checklist, NFRC list, insulation docs. Rater: ZERH forms, test results.
A1. Solar-Ready Construction Drawings
- Conduit: 1.25" min, metal or Sch. 40 PVC.
- Route: attic → mechanical room → panel; avoid bends > 360° total.
- PV-ready junction box: attic, accessible, labeled.
- Roof truss engineering: +4 psf dead load in PV zone.
- Solar zone diagram: dimensioned ≥300 ft² unobstructed area.
- Required labels: “PV Ready – Conduit,” “PV Interconnect Space Reserved.”
A2. Mechanical Ventilation Installation Details
- ERV/HRV supply to main living spaces; stale air pickup from baths/laundry.
- Outdoor air intake: ≥10 ft from exhausts; ≥2 ft above grade; ¼" mesh.
- CFIS: intake → filter → return plenum downstream of coil.
- Ventilation controller presets and scheduling documentation.
- ECM blower static compensation allowed; external static ≤0.36 in. w.c.
A3. Hot Water Distribution — Layout Specifications
- Max branch line: ≤8–10 ft typical.
- Max trunk line: ≤30–40 ft recommended.
- Home-run PEX: ⅜" or ½" to baths/kitchen where feasible.
- Water heater location: centrally located (≤20–30 ft to majority fixtures).
- Recirc pump: demand-control only (button/motion sensor); NO continuous timers.
A4. Air Barrier & Insulation Installation
- Sheathing seams fully taped; top plates sealed; rim joists foamed.
- Module seams (if any): gasket + foam + air-barrier tape.
- Attic insulation: baffles at all eaves; depth markers; R‑49 blown.
A5. Duct Installation Standards
- All joints sealed with mastic or UL‑181A/B tape.
- Ducts in conditioned space unless trade constraints; if not, R‑8 minimum.
B1. Air Barrier Continuity (Module-to-Module)
- Marriage wall: continuous air barrier via taped sheathing or membrane.
- Rim joist: factory-installed foam + site-applied closure foam.
- Ceiling plane air barrier: maintain continuity at module seams.
B2. HVAC Factory Integration
- ECM blower air handler installed with sealed return plenum.
- Fresh-air duct tap: 6" connection with balancing damper.
- Filter rack: 4" MERV 11–13 factory-installed; access panel required.
- Refrigerant line insulation: ≥⅜" thickness.
B3. Duct Bridging Across Modules
- Crossover ducts: sealed with mastic, insulated R‑8+, tested at site.
- Duct alignment: pre-marked factory stubs for installer.
B4. Plumbing Requirements
- All hot water lines insulated R‑3 inside module.
- Manifold location set for compact layout; branches labeled for site.
B5. Required Factory Documentation
- Factory QA insulation checklist.
- NFRC window inventory.
- Mechanical equipment AHRI certificate.
- Air barrier photo log (optional but recommended).
Include the following diagrams in construction documents:
- ERV/HRV airflow diagram (supply/exhaust, stale air locations).
- CFIS airflow path (intake → filter → return → blower).
- Outdoor air intake placement diagram.
- Ventilation controller wiring schematic.
Required for compliance and rater testing:
- Trunk/branch schematic with lengths.
- Manifold layout (if used) with loop distances.
- Water heater location diagram showing central placement.
- Recirc loop schematic (only if installed).
Domus Serenitas · Greenville, South Carolina (CZ 3A)
For Builder, Modular Manufacturer, HVAC Contractor & Rater
The Home Energy Rating System (HERS Index) measures a home’s energy performance compared to a standard new home.
This packet provides all design requirements, installation standards, test procedures, and documentation needed to achieve a low HERS Index Score (≤55; preferred ≤50) aligned with ENERGY STAR and Zero Energy Ready Home (ZERH).
These inputs must be confirmed and provided to the RESNET rater before construction.
Conditioned floor area (sq ft)
Ceiling heights (per level)
Building orientation (north arrow)
Roof type & color (solar heat gain impact)
Foundation type (slab / crawl / basement)
Window U-Factor
SHGC
Frame type (vinyl / fiberglass / composite)
Exterior door U-Factor
NFRC label copies required
Ceiling R-value
Wall R-value (cavity + continuous)
Floor R-value
Insulation material type
Air barrier materials & continuity plan
Heat pump model & efficiencies (SEER2 / HSPF2)
Furnace AFUE (if used)
Water heater type + UEF
Ventilation system type (CFIS / ERV / HRV)
Thermostat type (programmable / smart)
Duct location (attic, crawl, conditioned space, chase)
Duct insulation R-value
Leakage target (≤4 CFM25/100 sq ft)
Attic: R-38 minimum; R-49 preferred
Walls: R-20 OR R-13 + R-5 continuous
Floors: R-19
Rim joists fully insulated + sealed
No voids, compression, or misalignment
Tape exterior sheathing seams
Continuous air barrier behind tubs, showers, stair walls
Seal all top/bottom plates
Seal drywall–subfloor seams
Gasket or seal attic access
Windows: U ≤ 0.30; SHGC ≤ 0.25
Exterior doors insulated / energy rated
NFRC labels must remain until rater documents them
Required: ≤3.0 ACH50
ENERGY STAR / ZERH target: ≤2.5 ACH50
High-performance goal: ≤2.0 ACH50
Critical leakage points to address:
Rim joists
Plumbing + mechanical penetrations
Top plate seams
Attic knee walls
Fireplace chase
Electrical panel penetrations
Bottom plate-to-slab transitions
Room-by-room design
Correct infiltration assumptions
Accurate design temperatures
Use actual NFRC values
Equipment sized within ±15% of Manual J
No oversizing
Heat pumps preferred for HERS performance
Ducts sized to support ≤0.36 in. w.c. ESP
Return air pathways for all enclosed rooms
Proper register sizing per room
Heat pump: ≥15.2 SEER2 & ≥8.1 HSPF2
Furnace (if applicable): 95%+ AFUE
ECM blower required
AHRI certificate required
≤4 CFM25 per 100 sq ft of conditioned floor area
Verified by duct blaster test
Preferred: Entirely inside conditioned space
Acceptable: Factory-made chase for modular homes
Worst-case: Attic/crawl (must enhance sealing and insulation)
Mastic-seal all joints
UL-181 tape only as accessory
Supply ducts: R-6 minimum; R-8 preferred
Minimize return leakage
Formula:
0.03 × floor area + 7.5 × (bedrooms + 1)
CFIS (Central-Fan Integrated Supply)
ERV
HRV
Airflow measured with flow hood or duct traverse
Outdoor air intake documented
Controller settings documented
UEF ≥0.90 (heat pump water heater preferred)
Hot water lines insulated to R-3
Structured plumbing / manifold system recommended
Max 60-ft trunk line preferred
Demand-controlled recirculation allowed
Timer-based systems discouraged
South/SW roof area ≥300 sq ft
Conduit from attic to main panel
Roof designed for additional PV load
Solar area kept free of obstructions
Dedicated solar breaker space
Blower door (ACH50)
Duct leakage test (CFM25)
Mechanical ventilation airflow
Refrigerant charge verification
Thermostat setup verification
Thermal imaging
Static pressure test
Fan watt draw
Zonal pressure diagnostics
Floor plans + elevations
North arrow
Window schedule (U/SHGC)
Insulation R-values + air barrier details
Factory QA insulation checklist (modular)
Manual J, S, D
AHRI certificate
Ventilation model info
CFIS/ERV/HRV airflow verification form
Blower door
Duct blaster
Ventilation airflow
Refrigerant charge
Water heater UEF
Air barrier before insulation
Insulation installation (pre-drywall)
Duct sealing
Mechanical room
Window NFRC labels
Modular factory seam sealing
R-49 attic preferred; R-20 walls; R-19 floors
Windows: U ≤ 0.30 / SHGC ≤ 0.25
Blower door ≤ 3.0 ACH50 (target 2.5)
Install per Manual J/S/D
ECM blower
Duct leakage ≤4 CFM25/100 sq ft
Keep ducts inside conditioned space
ASHRAE 62.2 compliant
Verify CFIS/ERV/HRV airflow
Avoid blocking intakes and returns
UEF ≥0.90
Insulate all hot water lines
Use short, efficient distribution paths
Blower door
Duct leakage
Ventilation airflow
Refrigerant charge
Install Grade I insulation (R-38 ceiling, R-20 walls, R-19 floors)
Taped sheathing seams
Continuous air barrier
Insulate/seal rim joists
Install windows U ≤ 0.30 / SHGC ≤ 0.25
Leave NFRC labels on units
Pre-integrate factory flashing where possible
Install ECM blower air handler
Provide sealed return plenum
Provide 6" fresh-air duct tap location
Install 4" MERV 11–13 filter rack upstream of coil
Maintain service access for coil + filter
Pre-wire ventilation controller
Insulate all hot water lines (R-3)
Provide compact plumbing layout where feasible
Window/NFRC list
AHRI certificate
Factory insulation QA
Mechanical equipment data sheets